首頁 > 施工流程

CONSTRUCTION PROCEDURE
施工流程
  • STEP. 01

    整地

    Site Preparation

  • STEP. 02

    測量放樣

    Survey setting out

  • STEP. 03

    基礎開挖

    Excavation

  • STEP. 04

    基礎版鋼筋綁紮

    Rebar Binding at Foundation

  • STEP. 05

    基礎版模板組立

    Formwork

  • STEP. 06

    混凝土灌漿

    Concrete Pouring

  • STEP. 07

    拆模、廢土清運

    Deforming & Waste Disposal

  • STEP. 08

    基柱板模、覆土

    Pier formwork & Backfill

  • STEP. 09

    地樑鋼筋綁紮

    Girders

  • STEP. 10

    1.預埋螺栓測量放樣

    Embeded Bolts Layout

    2.預埋螺栓、鋼構基礎版

    Embeded Bolts and Steel Plate

    3.地樑模板、灌漿

    Formwork & Concrete Pouring at Girders

  • STEP. 11

    1.地樑拆模、接地銅棒打設

    Deforming & Copper Grounding

    2.水電配管、給排水管預埋

    Electricity & Pipework

    3.化糞池陰井配管

    Sewer System Installation

  • STEP. 12

    地樑養護

    Concrete Curing

  • STEP. 13

    1.土方回填、夯實

    Backfill & Compact

    2.級配回填

    Gravel Backfill

  • STEP. 14

    鋼構進場

    Arrival of Prefabricated Steel Parts

  • STEP. 15

    鋼骨組立

    Steel Framework

  • STEP. 16

    鷹架搭設 & 屋頂C型鋼組立

    Scaffold & Roof Framework w/ C-Section Steel

  • STEP. 17

    上樑

    Beam-raising Ceremony

  • STEP. 18

    柱腳無收縮水泥

    Non-shrink cement at column bases

  • STEP. 19

    二樓鋼承板、擋泥板鋪設

    Composite Steel Floor Deck

  • STEP. 20

    鋼構樓梯組裝

    Steel Stairs

  • STEP. 21

    1.外牆C型鋼組立

    Wall w/ C-section Steel

    2.剪力釘焊接

    Shear Studs

  • STEP. 22

    水電配管

    Utilities

  • STEP. 23

    樓板鋼筋綁紮

    Floor Slab Reinforcement

  • STEP. 24

    混凝土澆置

    Concrete Pouring

  • STEP. 25

    樓板養護

    Concrete Curing

TOP